How to commence repair works associated with the apartment?

The initial stage of typically the repair of aged apartments is the destruction and taking out first of just about all from the dilapidated wall space and partition walls, removing the wall structure and ceiling coating. This stage will be one of the most “dirty” levels from the repair.

One more among the most important and “dusty” functions is the windows block replacement. You ought to do this very first of all since dirt and dust will probably be unallowable during following stages in addition to it is prohibited at all to be able to open windows throughout painting and picture works (large falls of the temp and moisture are usually unallowable). After installation windows and windowsills it is essential to pack all of them immediately in polyethylene film and to be able to cover windowsills inside addition with the fiberboard (in order to prevent scratches).

The next period is wiring. Cabling can be installed in walls or even along the ground. Wiring is manufactured inside the plumbing to ensure power safety and boost reliability. The tube protects wiring from external damages and allows to substitute the wire entirely without breaking wall space and floor basically by inserting the newest wire instead regarding the old one.

House Painting comes after the wiring. The frequent mistake during the simultaneous conducting of such works occurs when workers forget to place out one of the cabling and house artists have already drunk and smoothed your wall. As a new result, additional performs are necessary to be able to seal chases within the finished wall. Typically the places of the particular feed switch and wall outlet location and the number need to be thought-out within advance. painters and decorators essex of power cabling is usually included to the design task.

Afterwards the program must be willing to service in case of failures. Inside addition to the particular wirings, the telephone cable and the TELEVISION cable are presented. The power wire really should not be laid out near the mobile phone and antenna cabling to avoid sound pickup and interference. Probably the most peculiar instant is laying out the TV cable connection. In order to make two (or three) TV sets in the apartment the other cable is frequently simply “firmly soldered” in parallel, therefore the cable level of resistance is lowered. Since a result, the image quality is deteriorated, many programs aren’t be received and etc. In buy to avoid this kind of situation it is necessary to request a specialist together with special equipment. He or she will measure the sign level of the particular each TV-feeder and install TV-amplifiers or TV-filters.

Painting is among the most long-term process, that is why it is conducted simultaneously in all premises, when it is possible. Delays are connected with the technology. Each applied coating of the plast typer (or filling within finishing) must dry out completely prior to the job will continue.

Performs in sanitary preparations and the cooking area begin simultaneously together with house painting. It is better to fulfill so-called “dirty” works inside the first spot and simultaneously. Inside accordance with the master plan of the hygienic technician location welded, wall chasing and pipe run usually are conducted. Steam radiator admissions are prepared, taps and mounting brackets are mounted, nevertheless radiators are certainly not mounted.

Then works within sanitary arrangements are conducted based on the plan. The bath will be mounted, then walls are smoothed out and the tile is laid about walls. The following stage is assembling ceiling and laying tiles on typically the floor. And in last other hygienic devices, mixers and accessories are attached.

After wiring, unit installation of rosette dishes and terminal boxes the voltage is usually checked in every point. Ends of electrical wiring are insulated and laid out in to rosette plates. Electrical sockets and breakers are not installed during this specific stage in purchase to save their own surface appearance. Typically the finish puttying regarding walls is conducted simultaneously. The technically exact control over drying of the coating of the plast typer (filling) is taken out by drymeter. It is the special instrument that will measures moisture of the material.

These stage is the process of fill. Load can be made together with different materials — from usual brickwork cement-sand mixture to be able to self-aligning floors. The particular advantage of the simple mixture is its cheapness, typically the disadvantage is of which such mixture is usually much harder in-line at the degree and the ultimate dry time of such fill is 40 days, only then the next stage of the particular use floor can be conducted, i. e. the time will be too long. Self-leveling self-aligning floors are more expensive, nevertheless more technological. Aligning occurs almost “automatically” i. e. liquid solution of mixture is poured out, then it runs and you receive the horizontal area. The final dry out time is two weeks i. e. you might have significant time overall economy. The system “warm floor” is mounted in to the fill. If the so-called “wet processes” are inapplicable the technology associated with the dry aligning (the fill technology) is used angles for floors together with adjustable floor battens are mounted.

After fill door containers and door are usually installed. Installation of entry doors must take into the account density of future flooring. After installation the doorway can be taken off its handles and removed till the end associated with repair or jam-packed into polyethylene motion picture to protect coming from damages. Simultaneously roof can be painted plus the tile may be laid in this premises where it was planned. The floor tile must be put on the absolutely dried out overlay.

Finishing of the floor installation depends on the particular planned covering. Inside most cases (if finish covering is not the tile) fill is covered by simply bitumen mastic and plywood sheets are usually laid. They are usually fixed to the ground by self-tapping screws. One plywood page is fixed by 30-50 self-tapping screws to provide typically the close fixing associated with plywood and long-term service of the flooring without squeak in addition to bulging. The particle board gives the additional heat- and traditional insulation. After mounting of the plywood is finished, wallpaper with regard to painting can become pasted on walls.

In premises wherever finish covering of the floor will be laminated flooring or perhaps parquet hoard, the ordinary wallpapers are pasted (not for painting) in the very first place. Then typically the flooring is attached.

If finish covering in the floor will be the block parquet, the parquet is usually laid to start with, after that it is scraped and covered simply by one layer associated with lacquer. After this specific the ordinary wall-papers are pasted plus the parquet is have the rest layers of lacquer (depending on the quality regarding the parquet in addition to lacquer). The described consequence is linked only with these kinds of scrambling process whenever the great quantity of dust is usually created. In spite of the fact that very good floor grinders are equipped with the vacuum cleaner, the sufficient amount associated with dust is precipitated on surrounding topics including walls. Dust particles is very acerbic and is badly washed off. Of which is why to be able not to destruction wallpapers, they are usually pasted after rushing and in order the parquet usually do not absorb the surplus moisture it is usually covered by the one layer of lacquer before wallpaper pasting.

After this typically the main works can be considered to be able to be finished. That is left only to install the plinths, decorative elements, breakers and sockets, curtain holders, to suspend doors, plant-bands in addition to others.

In conclusion this is necessary to note that typically the sequence of performs was listed inside general and can change depending on the particular situation – typically the number of areas in premise, your resources, peculiarities regarding the construction associated with the multilevel building. It is dependent on good sense and every person able to analysis can individually create such a new sequence.